Location
Edison, NJ
Size
480,000 SF
Type
Industrial
Cooling
240 tons
GC
Turner Construction
Completed
2023
Commerce Park Industrial is a 480,000 SF advanced manufacturing facility. CNC Cooling installed process exhaust systems, make-up air, rooftop units for office areas, and a comprehensive building automation system.
Challenge
The manufacturing process required precise temperature and humidity control in clean rooms while maintaining high-volume exhaust. The process exhaust needed to handle chemical-laden air.
Execution
We designed a dedicated process exhaust system with chemical-resistant materials and a make-up air system sized to match exhaust volume exactly. Clean room HVAC was isolated with dedicated precision controls.
Outcome
The facility passed all commissioning tests on the first attempt. Process downtime due to HVAC was zero in the first year of operation.
Similar Industrial Projects
Start Your Next Project
Invite CNC Cooling to bid on your next commercial construction project. We respond within 48 hours.
