Location
Newark, NJ
Size
600,000 SF
Type
Industrial
Cooling
200 tons
GC
Turner Construction
Completed
2023
A 600,000 SF state-of-the-art distribution center for Prologis, featuring cross-dock loading and 40-foot clear height. CNC Cooling provided the complete HVAC system including high-capacity rooftop units for the office areas, gas-fired unit heaters for the warehouse, make-up air systems, and comprehensive exhaust ventilation.
Construction Gallery
Challenge
The warehouse's 40-foot clear height created significant heating stratification issues. The 150 loading dock doors generated massive heat loss requiring careful make-up air and dock heating design.
Execution
We installed destratification fans and designed a zoned heating system that maintained comfortable temperatures at floor level. High-speed air curtains at all dock doors minimized thermal bridging during operations.
Outcome
Energy costs came in 22% below the owner's projections. The mechanical systems supported 24/7 warehouse operations from day one, and the building achieved full occupancy within 60 days of completion.