Industrial

Metro Distribution Center

RTUs, gas-fired heaters, exhaust, ventilation

Location

Newark, NJ

Size

600,000 SF

Type

Industrial

Cooling

200 tons

GC

Turner Construction

Completed

2023

Overview

A 600,000 SF state-of-the-art distribution center for Prologis, featuring cross-dock loading and 40-foot clear height. CNC Cooling provided the complete HVAC system including high-capacity rooftop units for the office areas, gas-fired unit heaters for the warehouse, make-up air systems, and comprehensive exhaust ventilation.

Construction Gallery

01

Challenge

The warehouse's 40-foot clear height created significant heating stratification issues. The 150 loading dock doors generated massive heat loss requiring careful make-up air and dock heating design.

02

Execution

We installed destratification fans and designed a zoned heating system that maintained comfortable temperatures at floor level. High-speed air curtains at all dock doors minimized thermal bridging during operations.

03

Outcome

Energy costs came in 22% below the owner's projections. The mechanical systems supported 24/7 warehouse operations from day one, and the building achieved full occupancy within 60 days of completion.