Skyline Tower East is a 42-story residential tower with 400 units and ground-floor retail. CNC Cooling delivered a complete mechanical package including a central chiller plant, condensing boiler plant, fan coil units in every apartment, and dedicated ventilation systems.
Construction Gallery
Challenge
The 42-story height required careful design of hydronic piping expansion and pressure break systems. Coordinating riser installations across 42 floors with multiple trades required detailed BIM coordination.
Execution
We implemented a multi-zone hydronic system with heat exchangers on the 14th and 28th floors to manage pressure. Full BIM coordination using Revit MEP eliminated all major clashes before installation.
Outcome
Zero mechanical clashes during installation thanks to BIM coordination. The building achieved LEED Gold and exceeded energy code by 32%.