The Grand at Riverside is a 320-unit luxury multifamily development in Brooklyn's waterfront district. CNC Cooling provided the complete mechanical package including a VRF system serving all residential units, dedicated outdoor air systems for ventilation, a central boiler plant for domestic hot water, and comprehensive exhaust systems for kitchens, bathrooms, and the parking garage.

Construction Gallery

01

Challenge

The tight urban site required precise coordination of equipment deliveries with crane lifts that could only occur during specific overnight windows. The phased occupancy schedule meant operating mechanical systems in occupied floors while construction continued above.

02

Execution

CNC Cooling developed a detailed logistics plan with the GC, scheduling all major equipment sets during 72-hour weekend crane windows. We implemented temporary ventilation and heating systems for occupied floors while maintaining construction-phase service to active work areas.

03

Outcome

The project was delivered on schedule with zero change orders related to mechanical installation. The VRF system achieved 28% better energy performance than the baseline ASHRAE model, and the building earned LEED Silver certification.