Back to Projects
Warehouse

Hudson Logistics Park

RTUs, unit heaters, make-up air, dock heating

Location

Kearny, NJ

Size

750,000 SF

Type

Warehouse

Cooling

280 tons

GC

Skanska

Completed

2022

Overview

Hudson Logistics Park is a 750,000 SF Class-A warehouse and distribution facility. CNC Cooling installed the complete HVAC system including high-capacity rooftop units, gas-fired unit heaters, make-up air systems, and dock door heating.

01

Challenge

The massive footprint and 40-foot clear height required careful zoning to maintain temperature uniformity. The 80 loading dock doors created enormous heat loss potential.

02

Execution

We designed a multi-zone heating system with destratification fans and high-speed air curtains at every dock door. The zoned approach reduced total heating load by 30%.

03

Outcome

Energy consumption came in 25% below the owner's pro forma. The facility was fully operational within 30 days of mechanical completion.