Location
Kearny, NJ
Size
750,000 SF
Type
Warehouse
Cooling
280 tons
GC
Skanska
Completed
2022
Hudson Logistics Park is a 750,000 SF Class-A warehouse and distribution facility. CNC Cooling installed the complete HVAC system including high-capacity rooftop units, gas-fired unit heaters, make-up air systems, and dock door heating.
Challenge
The massive footprint and 40-foot clear height required careful zoning to maintain temperature uniformity. The 80 loading dock doors created enormous heat loss potential.
Execution
We designed a multi-zone heating system with destratification fans and high-speed air curtains at every dock door. The zoned approach reduced total heating load by 30%.
Outcome
Energy consumption came in 25% below the owner's pro forma. The facility was fully operational within 30 days of mechanical completion.
Start Your Next Project
Invite CNC Cooling to bid on your next commercial construction project. We respond within 48 hours.